Executive Summary
- A credible DIALux study begins with a clean geometric model, verified photometric files, realistic surface reflectance, and documented observer viewpoints.
- Use illuminance, luminance, uniformity, glare, spill light, and energy results together; no single metric describes a facade experience.
- Simulation is a design decision tool and must be followed by aiming checks, night-time measurement, and commissioning records.
1. Build a traceable simulation model
Start by importing or rebuilding the relevant facade geometry at a controlled scale. Remove hidden geometry that does not influence light, but preserve balconies, fins, parapets, glazing, and adjacent surfaces that can create reflections or shadowing. Record coordinate origin, north direction, units, material reflectance, transmittance, and the revision of every luminaire file.
Photometric inputs
Use manufacturer IES or EULUMDAT files that match the proposed optic, drive current, colour temperature, and dimming state. Check whether the file represents absolute lumens or a relative distribution. Confirm the photometric centre, tilt convention, beam angle, lumen maintenance assumption, and any built-in glare shield. For architectural linear lighting the file must be measured on the actual extrusion and lens combination, not a generic 1 m sample. A beautiful render made with the wrong optic is not an engineering result.
2. Core equations and worked example
For a point-source screening calculation, E = I cos(theta) / d², where E is illuminance in lux, I is luminous intensity in candela, theta is the incidence angle, and d is distance in metres. If a luminaire produces 4,000 cd toward a wall point 12 m away at 20 degrees, E = 4,000 x cos(20 degrees) / 12² = 29.3 lux. DIALux accounts for the full photometric distribution, multiple sources, reflections, and calculation grids, so the point-source result is a reasonableness check rather than the final answer.
Uniformity can be expressed as U0 = Emin / Eavg. If a facade grid reports Emin = 18 lux and Eavg = 30 lux, U0 = 0.60. State the grid spacing and whether the calculation excludes boundary points. For luminance, relate reflected light to surface luminance using the selected material model and photometric engine; do not convert lux to cd/m² with an assumed reflectance unless that assumption is documented.
Glare and spill-light checks
Set observer positions for pedestrians, drivers, neighbouring properties, and upper floors. Review high-intensity directions, direct line of sight to LED apertures, reflected glare from glazing, and light trespass beyond the property line. Control glare with shielding, tilt limits, lower night-time output, warmer colour temperature where appropriate, and scene-based dimming.
3. Simulation parameter comparison
| Parameter | Concept study | Tender or approval study | Acceptance check |
|---|---|---|---|
| Geometry | Simplified massing | Coordinated facade model | As-built survey |
| Photometry | Representative distribution | Exact product file and drive state | Aiming and output verification |
| Calculation grid | Coarse visual grid | Defined spacing and boundaries | Calibrated measurement points |
| Scenarios | Normal and festive | All operating scenes and curfews | Night commissioning scenes |
4. From simulation to site
Freeze luminaire coordinates, tilt, mounting height, circuit ID, control address, and scene level in the schedule. During aiming, verify one reference zone before repeating the setting across the facade. Measure with a calibrated lux meter or luminance camera suited to the task and record ambient conditions, exposure settings, and measurement uncertainty. Compare the result to the approved calculation with the same grid and scene level.
For media facades, combine the photometric study with a pixel pitch and viewing-distance assessment. For power and control coordination, see the DMX addressing and commissioning guide.
💡 Engineering Tip
Save one simulation file per design revision and embed a calculation report date, luminaire-file checksum, and scene name in the exported PDF. This prevents an old photometric file from being mistaken for the approved design.
⚠️ Caution
Do not claim compliance from a rendered image. A render can hide clipping, saturated colours, glare, and boundary conditions. Approval should rely on traceable calculation outputs and field measurements.
5. FAQ
What is the most common simulation error?
Using an approximate or mismatched photometric file. The second most common is an unrealistic surface material or missing obstruction that changes the light path.
How fine should a facade calculation grid be?
It should resolve the smallest important lighting feature and the relevant approval area. State the spacing and perform a sensitivity check so a bright or dark narrow band is not averaged away.
Can DIALux predict glare from media pixels?
It can support the analysis when the source distribution and observer geometry are represented correctly, but high-dynamic-range pixel content requires scene-specific luminance review and field validation.
Related engineering guides
- How pixel pitch sets resolution and minimum viewing distance
- IP67 vs IP68 waterproofing for wet, marine and immersion exposure
- Outdoor media facade cost per square metre in 2026
- DMX RDM auto-addressing for faster commissioning
- Media facade lighting control system architecture
- LED mesh screen installation and service access
References & Standards
- DIALux official software and documentation
- CIE official publications on photometry and glare
- IEC standards catalogue
- ANSI standards portal
- UL lighting safety resources
- ISO standards catalogue
Need a review-ready lighting simulation?
Send the elevation model, luminaire files, observer locations, operating scenes, and approval criteria. We can prepare a traceable simulation package and a field verification plan.
Project enquiry
Send your drawings. Get a specification you can defend.
Elevation DWG, facade area, closest viewing distance and site country — we reply within 48 hours with a fixture matrix, power and DMX topology, and a quotation. No price-only quotes.
5,000+ projects delivered · 40+ countries · ISO 9001 · CE / UL / RoHS


